{"id":1228,"date":"2022-12-13T15:20:53","date_gmt":"2022-12-13T15:20:53","guid":{"rendered":"https:\/\/www.acis-complex.hu\/?page_id=1228"},"modified":"2023-01-17T18:59:02","modified_gmt":"2023-01-17T18:59:02","slug":"samsung-sdi","status":"publish","type":"page","link":"https:\/\/www.acis-complex.hu\/en\/referenciaink-old\/samsung-sdi\/","title":{"rendered":"Samsung SDI battery factory"},"content":{"rendered":"
\n <\/div>\n <\/div>\n\n<\/section>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\tSamsung SDI has been producing batteries of different sizes, types and uses for close to 20 years.
In its factory located in G\u00f6d, they produce prismatic battery cells for automobile industrial use.
The construction of the battery factory was started in 2016, and the factory has been continuously extended since then.
ACIS COMPLEX Kft has been participating in building the factory since the starts, starting from the clean space technological pipelines up to the DN1600 cooling water pipelines.<\/p><\/div><\/div>\n <\/section>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t
Complex 1<\/strong><\/p> - \u201eHook Up\u201d: tisztat\u00e9ri technol\u00f3gia vezet\u00e9kek ki\u00e9p\u00edt\u00e9se, termel\u0151 g\u00e9psorok lek\u00f6t\u00e9se. Complex 2<\/strong><\/p> - Module Pipe rack: The building of a pipe bridge consisting of more than 80 modules was carried out during 3 months, with integrating 2,200 tonnes of steel structures and 20 km pipes. Samsung SDI akkumul\u00e1torgy\u00e1r Ipari technol\u00f3giai cs\u0151rendszerek \u2022 G\u00f6d, Magyarorsz\u00e1g \u2022 2016 – 2022 Beruh\u00e1z\u00f3: Samsung SDI Hungary Zrt. Megrendel\u0151: SAMSUNG ENGINEERING HUNGARY Ltd. A Samsung SDI k\u00f6zel 20 \u00e9ve gy\u00e1rt k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171, t\u00edpus\u00fa \u00e9s felhaszn\u00e1l\u00e1si c\u00e9l\u00fa akkumul\u00e1torokat. A g\u00f6di gy\u00e1r\u00e1ban prizmatikus akkumul\u00e1torcell\u00e1kat gy\u00e1rtanak aut\u00f3ipari felhaszn\u00e1l\u00e1si c\u00e9lokra. Az akkumul\u00e1torgy\u00e1r \u00e9p\u00edt\u00e9se 2016-ban kezd\u0151d\u00f6tt, \u00e9s a gy\u00e1r az\u00f3ta […]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":345,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-1228","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/pages\/1228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/comments?post=1228"}],"version-history":[{"count":22,"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/pages\/1228\/revisions"}],"predecessor-version":[{"id":3179,"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/pages\/1228\/revisions\/3179"}],"up":[{"embeddable":true,"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/pages\/345"}],"wp:attachment":[{"href":"https:\/\/www.acis-complex.hu\/en\/wp-json\/wp\/v2\/media?parent=1228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
- Public utility building: its extension in 2 phases, installation and connection of pumps, coolers, other auxiliary equipment, deploying pipelines in the range of DN15-DN700 in the length of 10 km.
- Building SR and AC towers, installation of service machines, implementing pipe fitting on the roof in the height of 27 m.
- Reconnection of the New Cooling Tower with installing a new DN 900 distributor.
- New multi & stack line: extending the external pipe bridge with the integration of 2.7 km pipes.
- 64 m outdoor pipe rack: Extension of the pipe bridge with module-based construction technology, installation of 5.1 km pipes.<\/p>
-\u00a0Utility building: Compressed air system, cooling and cooled water system, steam and condensate pipelines and technological water transporting pipeline systems were built in a length of altogether 11 km.<\/p><\/div><\/div>\n <\/section>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t